Establishment of Tehachapi - 1876
The Tehachapi Pass played an important part in the race to build the first transcontinental railroad. In the south, construction was stopped at Caliente by what appeared as an insurmountable barrier, allowing the northern route through Donner Pass to be completed first. Eventually, William Hood, construction engineer, went to the summit of Tehachapi Pass where looked down and studied the contours and grades of the mountain. To enable steam engines to climb over the steep pass at the entrance to the canyon, he designed a loop to allow the train to climb by crossing over itself while keeping the grade at 2.2 percent.HM Number | HM2HD0 |
---|---|
Tags | |
Placed By | Main Street Tehachapi, Tehachapi Heritage League and The City of Tehachapi |
Marker Condition | No reports yet |
Date Added | Friday, May 31st, 2019 at 8:01pm PDT -07:00 |
UTM (WGS84 Datum) | 11S E 368100 N 3888586 |
---|---|
Decimal Degrees | 35.13151667, -118.44771667 |
Degrees and Decimal Minutes | N 35° 7.891', W 118° 26.863' |
Degrees, Minutes and Seconds | 35° 7' 53.46" N, 118° 26' 51.78" W |
Driving Directions | Google Maps |
Which side of the road? | Marker is on the right when traveling South |
Closest Postal Address | At or near , , |
Alternative Maps | Google Maps, MapQuest, Bing Maps, Yahoo Maps, MSR Maps, OpenCycleMap, MyTopo Maps, OpenStreetMap |
Is this marker missing? Are the coordinates wrong? Do you have additional information that you would like to share with us? If so, check in.
Comments 0 comments